We’re delighted that our new 150m2 assembly building is now complete, commissioned and now in use at Epsilon.
![](https://www.epsilonpsl.com/wp-content/uploads/2025/01/IMG_1156-300x225.jpg)
![](https://www.epsilonpsl.com/wp-content/uploads/2025/01/IMG_1157-300x225.jpg)
For some time, we have been short of space in our final assembly area and needed to expand and so we have designed and built a new energy efficient building to also allow for a “clean area” for FATs with customers prior to shipping of equipment. A £350,000 self-funded investment has allowed us to fit out a new building adjacent to the existing offices.
Using ASHP and energy efficient lighting combined with a top of the range specification for the insulated preconstructed panels helped us to gain an EP rating of A+.
The building is divided into a traditional small workshop and storage area, a white clean main assembly room along with and a smaller wet room for clean down and washing, since we are increasingly being asked to undertake feasibility trials and performance tests with placebo and non-potent actives. This area includes a waste-water collection system to allow us to deal with contaminated water in an environmentally controlled manner.
We look forward to welcoming you to the facility.